Project

Nanchang Mineral Systems is an excellent global manufacturer of high-end crushing and screening equipment systems and a full-industry chain operator of general contracting for mine processing. It is established in South Africa, Malaysia, Russia, Australia and India. Overseas branches and end users are found in mining, hydropower, nuclear power, stone, building materials, chemical industry and other industries home and abroad.

Home > Project > Shaanxi Coal Chemical and New Material Group’s Fuping Project

Shaanxi Coal Chemical and New Material Group’s Fuping Project

2020.06.28

Project Name: Shaanxi Coal Chemical and New Material Group’s Fuping Project

Location: Fuping, Shaanxi, China

Mine: limestone

Capacity: 3 million t/a

Main Equipment: JC jaw crusher, VS impact crusher, CC single cylinder cone crusher, YKR/ZKR-NJ vibrating screen, HPF bar feeder

Technological Process: jaw crushing + cone crushing + sand making + screening.

About the Project

According to the general requirements of “resource integration, total quantity control, transformation and upgrading, energy saving and emission reduction, and clean and environmental protection” issued by the government of Shaanxi Province, SHCCIG has been vigorously striving for comprehensive development and utilization of limestone resources, and has successively invested in the integrated development of limestone mines for construction stone materials at Pucheng, Fuping, Jingyang, Chunhua, Qianxian and other places. SHCCIG was the first domestic large-scale coal chemical industry group to transform to aggregates processing, with its coal aggregates production line becoming a model project for the integration of the local governments in Shaanxi Province.

NMS provided all the main equipment such as jaw crusher, cone crusher, sand maker, bar feeder and vibrating screen for the project. By identifying risk areas and narrowing the performance gap, NMS helped improve the overall level of operations, used comprehensive and in-depth data to make decisions for the project, and found the most effective methods to improve operating conditions for the project. Through the operation service, NMS ensured the normal operation, production process and optimization of the project, and found the ways to continuously improve the operation performance. The elimination work was completed within one month after NMS entered the site, and the system reached the production standard.

     

Other Case

Previous:2×2000 t/h Aggregate Project by Yixin Building Mat…

Next:Jingcao 1000 t/h Aggregates Project in Luanxian Co…

Related Products